The company is excited to be nearing gold and silver production early next year in an environment of several billion, according to Brian Johnson, executive chairman of EnviroGold Limited.
The project was designed to ease operations under dry conditions; it is proposed to doze tailings to an excavator which will load directly into moveable penstock.
The material will reportedly be slurried before being pumped to the process plant; 200 metres downstream from the storage damn.
For the best rates and deals on hotels, resorts and holiday accommodation in the Dominican Republic click here
If you found this interesting check out our updates on Facebook and Twitter.
Source: Mining Australia
No comments:
Post a Comment